Re-roofing · Perth

Re-roofing in Perth

Re-roofing for homes in Perth and the surrounding parts of Perth and Kinross, designed around your house and built by our teams under a single written contract.

Covering Perth

We work in Perth (PH1) and the places around it, including Auchterarder, Kinross and Blairgowrie.

Homes in Perth and Kinross

Housing in Scotland includes tenements in the cities, sandstone villas, inter-war and post-war semis and a large number of bungalows, which often suit dormer and upward extensions.

What is included in re-roofing in Perth?

Re-roofing means stripping a pitched roof back to the rafters and replacing the membrane, battens, tiles or slates, ridge and flashings. It is needed when a roof covering reaches the end of its life, and it is the right time to improve loft insulation.

  • Roof survey and quotation
  • Breathable membrane and new battens
  • New tiles or slates, ridge and verge

How much does re-roofing cost in Perth?

What re-roofing typically cost. These are guide ranges; the written quote for your house replaces them.

Re-roofingGuide price incl. VAT
Terraced house£6,000 to £10,000
Semi-detached house£8,000 to £15,000
Detached house£12,000 to £25,000

Planning and building rules in Perth

Scottish projects follow a different process from England: the council issues a building warrant before work starts and accepts a completion certificate at the end, alongside any planning permission needed. We prepare both applications.

Like-for-like re-roofing does not usually need planning permission in Scotland, except on listed buildings and in some conservation areas.

What should I think about before starting?

  • Heavier tiles than the original can overload old rafters.
  • Bats can roost in roofs; if signs are found, work pauses for advice.

From first call to completion

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

Re-roofing: common questions

How much does a new roof cost?

Around £6,000 to £10,000 for a terraced house, £8,000 to £15,000 for a semi and £12,000 to £25,000 for a detached house, including VAT.

How long does it take?

One to three weeks for most houses, weather permitting.

Who deals with the council for a project in Perth?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Re-roofing near Perth

Learn more about re-roofing, or see every project we cover in Perth.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote