What is re-roofing?
We erect scaffolding, strip the old covering, check and repair the timbers, then lay a breathable membrane, new battens and the new covering, with dry-fix ridge and verge systems. Fascias, soffits and guttering can be replaced at the same time.
- Roof survey and quotation
- Strip old covering and check timbers
- Fascias, soffits and guttering if required
What will re-roofing cost?
Guide prices for re-roofing, including VAT where it applies. Your fixed price is confirmed in writing after the survey.
| Re-roofing | Guide price incl. VAT |
|---|---|
| Terraced house | £6,000 to £10,000 |
| Semi-detached house | £8,000 to £15,000 |
| Detached house | £12,000 to £25,000 |
Planning and building rules in Sheffield
In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.
Replacing a roof covering like for like does not usually need planning permission in England.
What should Sheffield homeowners check first?
- Heavier tiles than the original can overload old rafters.
- Insulation upgrades at the same time can cut heat loss significantly.
How does the project run?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
Your questions answered
Do I need planning permission to re-roof?
Not usually for like-for-like replacement, unless the house is listed or in a conservation area with extra controls.
How long does it take?
One to three weeks for most houses, weather permitting.
Can you visit a house in Sheffield to quote?
Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.