Covering Slough
Slough sits 17 miles east of Reading, with Windsor 2 miles to the south and Maidenhead 5 miles to the west.
Homes in the South East
Many South East homes are inter-war or post-war semis and detached houses with room for rear and side extensions, while historic town centres and villages bring conservation area and listed building controls.
What does re-roofing involve?
We erect scaffolding, strip the old covering, check and repair the timbers, then lay a breathable membrane, new battens and the new covering, with dry-fix ridge and verge systems. Fascias, soffits and guttering can be replaced at the same time.
- Roof survey and quotation
- New tiles or slates, ridge and verge
- Fascias, soffits and guttering if required
What is the guide price for re-roofing in Slough?
Typical ranges for re-roofing. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.
| Re-roofing | Guide price incl. VAT |
|---|---|
| Terraced house | £6,000 to £10,000 |
| Semi-detached house | £8,000 to £15,000 |
| Detached house | £12,000 to £25,000 |
What approvals does re-roofing need in England?
English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.
Replacing a roof covering like for like does not usually need planning permission in England.
What should I think about before starting?
- Bats can roost in roofs; if signs are found, work pauses for advice.
- Insulation upgrades at the same time can cut heat loss significantly.
What happens after I enquire?
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Your questions answered
How long does it take?
One to three weeks for most houses, weather permitting.
Should I replace the fascias at the same time?
Usually yes, because the scaffolding is already up.
How do I get a price for re-roofing in Slough?
Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.
Re-roofing in nearby towns
Learn more about re-roofing, or see every project we cover in Slough.