Side return extensions · Bury

Side return extensions in Bury

Planning side return extensions in Bury? We design and build them for houses across Greater Manchester, and we fix the price for the agreed specification in writing before any building work starts.

Covering Bury

Our coverage around Bury (BL9) also includes Radcliffe (3 miles to the south) and Heywood.

Homes in the North West

The North West has long rows of Victorian terraced houses in its towns and cities, alongside inter-war semis and post-war estates, so rear extensions, dormer lofts and kitchen extensions are common projects.

What goes into a side return extension?

Side returns are small in area but heavy in detail: party walls, a glazed roof, and steelwork to take out the original back wall. We design the roof for light and drainage, agree the party wall process early, and keep the work tidy because access is often through the house.

  • Party wall notices and surveyor liaison
  • Structural steel to remove the side wall
  • Drainage and new gully positions

How much should I budget for a side return extension?

Indicative costs for side return extensions. London and the South East usually sit towards the top of each range.

Side return extensionsGuide price incl. VAT
Standard specification£3,350 to £3,700 per m²
Good specification£3,700 to £4,150 per m²
High specification£4,150 to £4,550 per m²

What approvals does a side return extension need in England?

In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.

In England a single-storey rear extension can often go ahead under permitted development: up to 3 m deep on an attached house or 4 m on a detached one, no higher than 4 m, with eaves no higher than 3 m within 2 m of a boundary.

What should I think about before starting?

  • Access is often through the house, so we plan deliveries and protect floors.
  • Many terraces sit in conservation areas, where side extensions need planning permission.

What are the steps?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Your questions answered

Is a glazed roof too hot in summer?

Modern solar-control glass and a mix of glazed and solid roof keep it comfortable. We advise on the balance during design.

How long does a side return take?

About 10 to 14 weeks on site.

Who deals with the council for a project in Bury?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Side return extensions near Bury

Learn more about side return extensions, or see every project we cover in Bury.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote