Side return extensions · Dalbeattie

Side return extensions in Dalbeattie

Our side return extensions service covers Dalbeattie and the rest of Dumfries and Galloway. You get a fixed price in writing for the agreed specification, and one person co-ordinating the trades.

Covering Dalbeattie

Our coverage around Dalbeattie (DG5) also includes Dumfries, Annan and Workington.

Projects in Dumfries and Galloway are taken on by arrangement, and any travel and accommodation costs for the team are shown openly in the quote.

Homes in Dumfries and Galloway

Scottish homes range from city tenements and sandstone terraces to bungalows and modern estates, and the building warrant process shapes the programme for every project.

What do you get with a side return extension?

A side return extension builds over the narrow passage that runs beside the back of many Victorian and Edwardian terraced houses, widening the kitchen or dining room by a metre or two. It is usually combined with a glazed or part-glazed roof so the deeper room still gets daylight.

  • Building warrant application and completion certificate
  • Glazed or solid roof with rooflights
  • Drainage and new gully positions

What will a side return extension cost?

Guide prices for side return extensions, including VAT where it applies. Your fixed price is confirmed in writing after the survey.

Side return extensionsGuide price incl. VAT
Standard specification£3,350 to £3,700 per m²
Good specification£3,700 to £4,150 per m²
High specification£4,150 to £4,550 per m²

What approvals does a side return extension need in Scotland?

Projects in Scotland need a building warrant from the council before any building work starts, and a completion certificate once it is finished. Planning permission is a separate decision. The Party Wall etc. Act does not apply in Scotland; shared walls are governed by title deeds and the law of the tenement where relevant.

Scotland has its own householder permitted development rules, and small single-storey rear extensions are often covered. Whatever the planning position, you need a building warrant from the council before any building work starts, and a completion certificate at the end.

What should I think about before starting?

  • Glazed roofs need careful detailing against the neighbour’s wall.
  • Many terraces sit in conservation areas, where side extensions need planning permission.

What happens after I enquire?

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

Questions about a side return extension in Dalbeattie

Is a glazed roof too hot in summer?

Modern solar-control glass and a mix of glazed and solid roof keep it comfortable. We advise on the balance during design.

How long does a side return take?

About 10 to 14 weeks on site.

Who deals with the council for a project in Dalbeattie?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Side return extensions near Dalbeattie

Learn more about side return extensions, or see every project we cover in Dalbeattie.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote