Side return extensions · Gravesend

Side return extensions in Gravesend

If you live in Gravesend and want side return extensions, we can take the whole job off your hands, from measuring the house to handing over a finished room.

Covering Gravesend

Our coverage around Gravesend (DA12) also includes Grays (3 miles to the north-west) and Strood.

Homes in the South East

The South East has a lot of 1930s and post-war semi-detached housing, well suited to rear extensions and hip-to-gable loft conversions, alongside period properties in conservation areas that need a more careful design.

What do you get with a side return extension?

Side returns are small in area but heavy in detail: party walls, a glazed roof, and steelwork to take out the original back wall. We design the roof for light and drainage, agree the party wall process early, and keep the work tidy because access is often through the house.

  • Party wall notices and surveyor liaison
  • Structural steel to remove the side wall
  • Drainage and new gully positions

How much does a side return extension cost in Gravesend?

Use these ranges to budget for side return extensions; the survey turns them into a fixed price for the agreed specification.

Side return extensionsGuide price incl. VAT
Standard specification£3,350 to £3,700 per m²
Good specification£3,700 to £4,150 per m²
High specification£4,150 to £4,550 per m²

Planning and building rules in Gravesend

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

In England a single-storey rear extension can often go ahead under permitted development: up to 3 m deep on an attached house or 4 m on a detached one, no higher than 4 m, with eaves no higher than 3 m within 2 m of a boundary. Deeper extensions, up to 6 m or 8 m, need prior approval from the council first.

What can change the price or programme?

  • Most side returns touch a shared boundary, so the Party Wall etc. Act 1996 usually applies in England and Wales.
  • Access is often through the house, so we plan deliveries and protect floors.

What are the steps?

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

Your questions answered

Does a side return need planning permission?

In England it can be permitted development if it is single storey, no higher than 4 m and no wider than half the original house. Conservation areas are the main exception.

How long does a side return take?

About 10 to 14 weeks on site.

How do I get a price for side return extensions in Gravesend?

Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.

Side return extensions near Gravesend

Learn more about side return extensions, or see every project we cover in Gravesend.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote