Side return extensions · Limavady

Side return extensions in Limavady

Homeowners in Limavady can get side return extensions from one company: the design, the paperwork and the building work sit with us rather than with three separate firms.

Covering Limavady

Limavady is about 15 miles east of Derry. We also cover Coleraine (13 miles to the north-east), Derry and Portrush.

Homes in County Londonderry

Across Northern Ireland you find city terraces, suburban semis and rural bungalows and farmhouses, so the right approach depends on the plot and the planning history.

What does a side return extension involve?

A side return extension builds over the narrow passage that runs beside the back of many Victorian and Edwardian terraced houses, widening the kitchen or dining room by a metre or two. It is usually combined with a glazed or part-glazed roof so the deeper room still gets daylight.

  • Structural steel to remove the side wall
  • Drainage and new gully positions
  • Underfloor heating ready screed if wanted

How much does a side return extension cost in Limavady?

Use these ranges to budget for side return extensions; the survey turns them into a fixed price for the agreed specification.

Side return extensionsGuide price incl. VAT
Standard specification£3,350 to £3,700 per m²
Good specification£3,700 to £4,150 per m²
High specification£4,150 to £4,550 per m²

Planning and building rules in Limavady

Projects in Northern Ireland need planning clearance from one of the eleven councils and building control approval, also from the council. The Party Wall etc. Act does not extend to Northern Ireland, so work near neighbours is agreed directly and documented carefully.

In Northern Ireland permitted development is set by the Planning (General Permitted Development) Order (Northern Ireland) 2015, and small single-storey rear extensions can often go ahead without an application.

What should Limavady homeowners check first?

  • Glazed roofs need careful detailing against the neighbour’s wall.
  • Many terraces sit in conservation areas, where side extensions need planning permission.

How does the project run?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

Side return extensions: common questions

Is a glazed roof too hot in summer?

Modern solar-control glass and a mix of glazed and solid roof keep it comfortable. We advise on the balance during design.

How long does a side return take?

About 10 to 14 weeks on site.

How do I get a price for side return extensions in Limavady?

Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.

Side return extensions in nearby towns

Learn more about side return extensions, or see every project we cover in Limavady.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote