Covering New Malden
We work in New Malden (KT3) and the places around it, including Surbiton, Morden and Wimbledon.
Homes in London
London projects often mean working on period terraces with neighbours on both sides, tight access through the house and conservation area controls, so careful planning and party wall work matter as much as the build.
What goes into a side return extension?
A side return extension builds over the narrow passage that runs beside the back of many Victorian and Edwardian terraced houses, widening the kitchen or dining room by a metre or two. It is usually combined with a glazed or part-glazed roof so the deeper room still gets daylight.
- Drainage and new gully positions
- Underfloor heating ready screed if wanted
- Plastering and making good to the old house
What will a side return extension cost?
Typical ranges for side return extensions. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.
| Side return extensions | Guide price incl. VAT |
|---|---|
| Standard specification | £3,350 to £3,700 per m² |
| Good specification | £3,700 to £4,150 per m² |
| High specification | £4,150 to £4,550 per m² |
Do you need permission for a side return extension in New Malden?
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
In England a single-storey rear extension can often go ahead under permitted development: up to 3 m deep on an attached house or 4 m on a detached one, no higher than 4 m, with eaves no higher than 3 m within 2 m of a boundary.
What should I think about before starting?
- Most side returns touch a shared boundary, so the Party Wall etc. Act 1996 usually applies in England and Wales.
- Many terraces sit in conservation areas, where side extensions need planning permission.
From first call to completion
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
Side return extensions: common questions
Will I need a party wall agreement?
Most likely, because the new wall usually sits on or near the boundary. We serve the notices and work with your neighbour’s surveyor if one is appointed.
How long does a side return take?
About 10 to 14 weeks on site.
Do you work in New Malden?
Yes. New Malden is within our coverage for side return extensions, along with nearby Surbiton and Morden.
Also covering
- Side return extensions in Surbiton
- Side return extensions in Morden
- Side return extensions in Wimbledon
- Side return extensions in Ewell
Learn more about side return extensions, or see every project we cover in New Malden.

