Covering Thornaby-on-Tees
Thornaby-on-Tees sits 41 miles north of York, with Stockton-on-Tees 3 miles to the north and Billingham 4 miles to the north.
Homes in Yorkshire and the Humber
Across Yorkshire and the Humber, older stone and brick terraces sit alongside inter-war semis and newer estates, and dormers and rear extensions are designed to suit each.
What is a side return extension?
A side return extension builds over the narrow passage that runs beside the back of many Victorian and Edwardian terraced houses, widening the kitchen or dining room by a metre or two. It is usually combined with a glazed or part-glazed roof so the deeper room still gets daylight.
- Party wall notices and surveyor liaison
- Drainage and new gully positions
- Underfloor heating ready screed if wanted
How much should I budget for a side return extension?
Typical ranges for side return extensions. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.
| Side return extensions | Guide price incl. VAT |
|---|---|
| Standard specification | £3,350 to £3,700 per m² |
| Good specification | £3,700 to £4,150 per m² |
| High specification | £4,150 to £4,550 per m² |
Do you need permission for a side return extension in Thornaby-on-Tees?
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
In England a single-storey rear extension can often go ahead under permitted development: up to 3 m deep on an attached house or 4 m on a detached one, no higher than 4 m, with eaves no higher than 3 m within 2 m of a boundary.
What should Thornaby-on-Tees homeowners check first?
- Access is often through the house, so we plan deliveries and protect floors.
- Glazed roofs need careful detailing against the neighbour’s wall.
What happens after I enquire?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
Questions about a side return extension in Thornaby-on-Tees
Is a glazed roof too hot in summer?
Modern solar-control glass and a mix of glazed and solid roof keep it comfortable. We advise on the balance during design.
How long does a side return take?
About 10 to 14 weeks on site.
Can you visit a house in Thornaby-on-Tees to quote?
Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.
Side return extensions near Thornaby-on-Tees
- Side return extensions in Stockton-on-Tees
- Side return extensions in Billingham
- Side return extensions in Middlesbrough
- Side return extensions in Darlington
Learn more about side return extensions, or see every project we cover in Thornaby-on-Tees.

