Side return extensions · Ystalyfera

Side return extensions in Ystalyfera

Homeowners in Ystalyfera can get side return extensions from one company: the design, the paperwork and the building work sit with us rather than with three separate firms.

Covering Ystalyfera

Our coverage around Ystalyfera (SA9) also includes Neath, Ammanford and Pontarddulais.

Homes in West Glamorgan

Welsh homes include long terraces built into hillsides, stone cottages and modern estates, and sloping sites often shape how and where an extension can go.

What is included in a side return extension in Ystalyfera?

A side return extension builds over the narrow passage that runs beside the back of many Victorian and Edwardian terraced houses, widening the kitchen or dining room by a metre or two. It is usually combined with a glazed or part-glazed roof so the deeper room still gets daylight.

  • Planning and building regulations checks under Welsh rules
  • Party wall notices and surveyor liaison
  • Plastering and making good to the old house

How much does a side return extension cost in Ystalyfera?

Guide prices for side return extensions, including VAT where it applies. Your fixed price is confirmed in writing after the survey.

Side return extensionsGuide price incl. VAT
Standard specification£3,350 to £3,700 per m²
Good specification£3,700 to £4,150 per m²
High specification£4,150 to £4,550 per m²

How is a side return extension approved in Ystalyfera?

In Wales the planning rules, including what counts as permitted development, are set by the Welsh Government, and Welsh building regulations differ in places from England’s. We check both against your house before drawings are finalised, and handle party wall notices where needed.

Wales has its own permitted development rules, set by the Welsh Government. Small single-storey rear extensions can often go ahead without an application, but the limits differ from England's and there is no larger-extension prior approval route, so we check the current Welsh rules for your house before drawings are finalised.

What can affect a side return extension?

  • Access is often through the house, so we plan deliveries and protect floors.
  • Many terraces sit in conservation areas, where side extensions need planning permission.

From first call to completion

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

Your questions answered

Will I need a party wall agreement?

Most likely, because the new wall usually sits on or near the boundary. We serve the notices and work with your neighbour’s surveyor if one is appointed.

How long does a side return take?

About 10 to 14 weeks on site.

Can you visit a house in Ystalyfera to quote?

Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.

Other towns nearby

Learn more about side return extensions, or see every project we cover in Ystalyfera.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote