Single-storey extensions · Abergavenny

Single-storey extensions in Abergavenny

Planning single-storey extensions in Abergavenny? We design and build them for houses across Gwent, and we fix the price for the agreed specification in writing before any building work starts.

Covering Abergavenny

Abergavenny is about 16 miles north of Newport. We also cover Pontypool (8 miles to the south), Ebbw Vale and Cwmbran.

Homes in Gwent

Across Wales you find valley terraces, coastal towns, rural stone houses and newer estates, so access, slopes and local materials all feature in the design.

What do you get with a single-storey extension?

We design the extension around how you use the house: where the light comes from, how the new room joins the old one, and what happens to the drains and the garden. The structure is built in brick or block to match the house, finished with a flat roof and lantern or a pitched roof, then insulated, plastered and handed back ready to decorate.

  • Measured survey and design drawings
  • Building control application and inspections
  • First-fix and second-fix electrics, plastering and making good

How much should I budget for a single-storey extension?

Typical ranges for single-storey extensions. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.

Single-storey extensionsGuide price incl. VAT
Standard specification£2,600 to £3,000 per m²
Good specification£3,000 to £3,500 per m²
High specification£3,500 to £4,000 per m²

Planning and building rules in Abergavenny

In Wales the planning rules, including what counts as permitted development, are set by the Welsh Government, and Welsh building regulations differ in places from England’s. We check both against your house before drawings are finalised, and handle party wall notices where needed.

Wales has its own permitted development rules, set by the Welsh Government. Small single-storey rear extensions can often go ahead without an application, but the limits differ from England's and there is no larger-extension prior approval route, so we check the current Welsh rules for your house before drawings are finalised.

What should I think about before starting?

  • Large glazed areas need to meet energy rules, which can shape the size of doors and rooflights.
  • Kitchens and doors have long lead times, so we order them early.

How does the project run?

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Questions about a single-storey extension in Abergavenny

How long does a single-storey extension take to build?

The build itself usually takes 10 to 16 weeks once work starts on site. Design, approvals and ordering usually add 6 to 12 weeks before that.

Will the brick match?

We source the closest available match for colour, size and texture and agree a sample panel with you before laying.

Who deals with the council for a project in Abergavenny?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Single-storey extensions in nearby towns

Learn more about single-storey extensions, or see every project we cover in Abergavenny.