Single-storey extensions · Ballymena

Single-storey extensions in Ballymena

Our single-storey extensions service covers Ballymena and the rest of County Antrim. You get a fixed price in writing for the agreed specification, and one person co-ordinating the trades.

Covering Ballymena

Ballymena sits 23 miles north-west of Belfast, with Magherafelt 15 miles to the south-west and Ballymoney 17 miles to the north-west.

Homes in County Antrim

Northern Ireland has a high proportion of detached houses and bungalows outside the cities, which often suit side extensions, rear extensions and upward extensions.

What do you get with a single-storey extension?

We design the extension around how you use the house: where the light comes from, how the new room joins the old one, and what happens to the drains and the garden. The structure is built in brick or block to match the house, finished with a flat roof and lantern or a pitched roof, then insulated, plastered and handed back ready to decorate.

  • Building control application and inspections
  • Brickwork, roof, glazing and insulation
  • First-fix and second-fix electrics, plastering and making good

What will a single-storey extension cost?

Guide prices for single-storey extensions, including VAT where it applies. Your fixed price is confirmed in writing after the survey.

Single-storey extensionsGuide price incl. VAT
Standard specification£2,600 to £3,000 per m²
Good specification£3,000 to £3,500 per m²
High specification£3,500 to £4,000 per m²

What approvals does a single-storey extension need in Northern Ireland?

Northern Ireland projects need planning clearance and building control approval from the local council. We prepare the applications and agree any work near neighbouring property directly with the neighbours.

In Northern Ireland permitted development is set by the Planning (General Permitted Development) Order (Northern Ireland) 2015, and small single-storey rear extensions can often go ahead without an application.

What can affect a single-storey extension?

  • Large glazed areas need to meet energy rules, which can shape the size of doors and rooflights.
  • Kitchens and doors have long lead times, so we order them early.

How does the project run?

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

What people ask before starting

How long does a single-storey extension take to build?

The build itself usually takes 10 to 16 weeks once work starts on site. Design, approvals and ordering usually add 6 to 12 weeks before that.

Can we stay in the house during the build?

Usually yes. We keep the existing house closed off from the works until the knock-through near the end, and agree a temporary kitchen set-up with you if the kitchen is affected.

Can you visit a house in Ballymena to quote?

Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.

Single-storey extensions in nearby towns

Learn more about single-storey extensions, or see every project we cover in Ballymena.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote