Covering Blyth
Alongside Blyth, we also cover Bedlington, Ashington (4 miles to the north-west) and Cramlington.
Projects in Northumberland are taken on by arrangement, and any travel and accommodation costs for the team are shown openly in the quote.
Homes in the North East
The North East has terraced housing including Tyneside flats, inter-war semis and post-war estates, so loft conversions, rear extensions and layout changes are popular ways to add space.
What is a single-storey extension?
A single-storey extension adds one level of new floor space to the back or side of a house, usually to open up a kitchen, dining or family room. It is the most common way to gain space without moving, and many can be built without a planning application.
- Building control application and inspections
- Foundations, drainage and structural steel
- Brickwork, roof, glazing and insulation
How much does a single-storey extension cost in Blyth?
Guide prices for single-storey extensions, including VAT where it applies. Your fixed price is confirmed in writing after the survey.
| Single-storey extensions | Guide price incl. VAT |
|---|---|
| Standard specification | £2,600 to £3,000 per m² |
| Good specification | £3,000 to £3,500 per m² |
| High specification | £3,500 to £4,000 per m² |
Do you need permission for a single-storey extension in Blyth?
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
In England a single-storey rear extension can often go ahead under permitted development: up to 3 m deep on an attached house or 4 m on a detached one, no higher than 4 m, with eaves no higher than 3 m within 2 m of a boundary.
What should I think about before starting?
- Large glazed areas need to meet energy rules, which can shape the size of doors and rooflights.
- Kitchens and doors have long lead times, so we order them early.
What happens after I enquire?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
Your questions answered
How long does a single-storey extension take to build?
The build itself usually takes 10 to 16 weeks once work starts on site. Design, approvals and ordering usually add 6 to 12 weeks before that.
Can we stay in the house during the build?
Usually yes. We keep the existing house closed off from the works until the knock-through near the end, and agree a temporary kitchen set-up with you if the kitchen is affected.
How do I get a price for single-storey extensions in Blyth?
Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.
Also covering
- Single-storey extensions in Bedlington
- Single-storey extensions in Ashington
- Single-storey extensions in Cramlington
- Single-storey extensions in Whitley Bay
Learn more about single-storey extensions, or see every project we cover in Blyth.

