Canning Town sits 6 miles east of London, with Stratford 2 miles to the north-west and Bow 2 miles to the north-west.
Homes in London
Terraced houses dominate many London neighbourhoods, so most projects involve shared walls, narrow access and a party wall process. Conservation areas are widespread, and some boroughs have their own mansard and basement guidance.
What do you get with a single-storey extension?
A single-storey extension adds one level of new floor space to the back or side of a house, usually to open up a kitchen, dining or family room. It is the most common way to gain space without moving, and many can be built without a planning application.
- Measured survey and design drawings
- Building control application and inspections
- Brickwork, roof, glazing and insulation
How much should I budget for a single-storey extension?
Indicative costs for single-storey extensions. London and the South East usually sit towards the top of each range.
| Single-storey extensions | Guide price incl. VAT |
|---|---|
| Standard specification | £2,600 to £3,000 per m² |
| Good specification | £3,000 to £3,500 per m² |
| High specification | £3,500 to £4,000 per m² |
Planning and building rules in Canning Town
English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.
In England a single-storey rear extension can often go ahead under permitted development: up to 3 m deep on an attached house or 4 m on a detached one, no higher than 4 m, with eaves no higher than 3 m within 2 m of a boundary.
What should Canning Town homeowners check first?
- Building on or near a shared boundary usually means serving a party wall notice in England and Wales.
- Kitchens and doors have long lead times, so we order them early.
What are the steps?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
Single-storey extensions: common questions
How long does a single-storey extension take to build?
The build itself usually takes 10 to 16 weeks once work starts on site. Design, approvals and ordering usually add 6 to 12 weeks before that.
Can we stay in the house during the build?
Usually yes. We keep the existing house closed off from the works until the knock-through near the end, and agree a temporary kitchen set-up with you if the kitchen is affected.
Can you visit a house in Canning Town to quote?
Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.
Single-storey extensions in nearby towns
- Single-storey extensions in Stratford
- Single-storey extensions in Bow
- Single-storey extensions in Greenwich
- Single-storey extensions in Barking
Learn more about single-storey extensions, or see every project we cover in Canning Town.