Covering Havant
Havant is about 19 miles east of Southampton. We also cover Waterlooville (3 miles to the north-west), Portsmouth and Gosport.
Homes in the South East
Housing across the South East mixes inter-war semis, post-war estates and older cottages in villages and market towns, so rear and side extensions, hip-to-gable lofts and garage conversions all come up regularly.
What do you get with a single-storey extension?
We design the extension around how you use the house: where the light comes from, how the new room joins the old one, and what happens to the drains and the garden. The structure is built in brick or block to match the house, finished with a flat roof and lantern or a pitched roof, then insulated, plastered and handed back ready to decorate.
- Measured survey and design drawings
- Foundations, drainage and structural steel
- First-fix and second-fix electrics, plastering and making good
How much does a single-storey extension cost in Havant?
Indicative costs for single-storey extensions. London and the South East usually sit towards the top of each range.
| Single-storey extensions | Guide price incl. VAT |
|---|---|
| Standard specification | £2,600 to £3,000 per m² |
| Good specification | £3,000 to £3,500 per m² |
| High specification | £3,500 to £4,000 per m² |
Planning and building rules in Havant
In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.
In England a single-storey rear extension can often go ahead under permitted development: up to 3 m deep on an attached house or 4 m on a detached one, no higher than 4 m, with eaves no higher than 3 m within 2 m of a boundary. Deeper extensions, up to 6 m or 8 m, need prior approval from the council first.
What can affect a single-storey extension?
- Drains under the footprint may need diverting or a build-over agreement with the water company.
- Kitchens and doors have long lead times, so we order them early.
What happens after I enquire?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
What people ask before starting
How long does a single-storey extension take to build?
The build itself usually takes 10 to 16 weeks once work starts on site. Design, approvals and ordering usually add 6 to 12 weeks before that.
Will the brick match?
We source the closest available match for colour, size and texture and agree a sample panel with you before laying.
How do I get a price for single-storey extensions in Havant?
Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.
Single-storey extensions in nearby towns
- Single-storey extensions in Waterlooville
- Single-storey extensions in Portsmouth
- Single-storey extensions in Gosport
- Single-storey extensions in Fareham
Learn more about single-storey extensions, or see every project we cover in Havant.

