Single-storey extensions · Kilwinning

Single-storey extensions in Kilwinning

Homeowners in Kilwinning can get single-storey extensions from one company: the design, the paperwork and the building work sit with us rather than with three separate firms.

Covering Kilwinning

Our coverage around Kilwinning (KA13) also includes Irvine, Troon and Kilmarnock.

Homes in Ayrshire

Housing in Scotland includes tenements in the cities, sandstone villas, inter-war and post-war semis and a large number of bungalows, which often suit dormer and upward extensions.

What is a single-storey extension?

We design the extension around how you use the house: where the light comes from, how the new room joins the old one, and what happens to the drains and the garden. The structure is built in brick or block to match the house, finished with a flat roof and lantern or a pitched roof, then insulated, plastered and handed back ready to decorate.

  • Measured survey and design drawings
  • Building control application and inspections
  • Brickwork, roof, glazing and insulation

How much does a single-storey extension cost in Kilwinning?

Typical ranges for single-storey extensions. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.

Single-storey extensionsGuide price incl. VAT
Standard specification£2,600 to £3,000 per m²
Good specification£3,000 to £3,500 per m²
High specification£3,500 to £4,000 per m²

How is a single-storey extension approved in Kilwinning?

Scottish projects follow a different process from England: the council issues a building warrant before work starts and accepts a completion certificate at the end, alongside any planning permission needed. We prepare both applications.

Scotland has its own householder permitted development rules, and small single-storey rear extensions are often covered.

What should Kilwinning homeowners check first?

  • Drains under the footprint may need diverting or a build-over agreement with the water company.
  • Large glazed areas need to meet energy rules, which can shape the size of doors and rooflights.

How does the project run?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

What people ask before starting

How long does a single-storey extension take to build?

The build itself usually takes 10 to 16 weeks once work starts on site. Design, approvals and ordering usually add 6 to 12 weeks before that.

Do you need to dig up the drains?

Sometimes. If a public sewer runs under the extension, the water company has to agree a build-over or a diversion. We check this at survey stage.

How do I get a price for single-storey extensions in Kilwinning?

Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.

Also covering

Learn more about single-storey extensions, or see every project we cover in Kilwinning.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote