Covering Kirkcaldy
Kirkcaldy sits 12 miles east of Dunfermline, with Glenrothes 5 miles to the north and Kinross 12 miles to the north-west.
Homes in Fife
Scottish homes range from city tenements and sandstone terraces to bungalows and modern estates, and the building warrant process shapes the programme for every project.
What does a single-storey extension involve?
We design the extension around how you use the house: where the light comes from, how the new room joins the old one, and what happens to the drains and the garden. The structure is built in brick or block to match the house, finished with a flat roof and lantern or a pitched roof, then insulated, plastered and handed back ready to decorate.
- Building warrant application and completion certificate
- Foundations, drainage and structural steel
- Brickwork, roof, glazing and insulation
How much should I budget for a single-storey extension?
Use these ranges to budget for single-storey extensions; the survey turns them into a fixed price for the agreed specification.
| Single-storey extensions | Guide price incl. VAT |
|---|---|
| Standard specification | £2,600 to £3,000 per m² |
| Good specification | £3,000 to £3,500 per m² |
| High specification | £3,500 to £4,000 per m² |
How is a single-storey extension approved in Kirkcaldy?
Scottish projects follow a different process from England: the council issues a building warrant before work starts and accepts a completion certificate at the end, alongside any planning permission needed. We prepare both applications.
Scotland has its own householder permitted development rules, and small single-storey rear extensions are often covered.
What can change the price or programme?
- Drains under the footprint may need diverting or a build-over agreement with the water company.
- Kitchens and doors have long lead times, so we order them early.
How does the project run?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
What people ask before starting
How long does a single-storey extension take to build?
The build itself usually takes 10 to 16 weeks once work starts on site. Design, approvals and ordering usually add 6 to 12 weeks before that.
Can we stay in the house during the build?
Usually yes. We keep the existing house closed off from the works until the knock-through near the end, and agree a temporary kitchen set-up with you if the kitchen is affected.
How do I get a price for single-storey extensions in Kirkcaldy?
Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.
Single-storey extensions in nearby towns
- Single-storey extensions in Glenrothes
- Single-storey extensions in Kinross
- Single-storey extensions in Dunfermline
- Single-storey extensions in Musselburgh
Learn more about single-storey extensions, or see every project we cover in Kirkcaldy.