Single-storey extensions in Newtownards

If you live in Newtownards and want single-storey extensions, we can take the whole job off your hands, from measuring the house to handing over a finished room.

Covering Newtownards

Newtownards is about 18 miles north of Downpatrick. We also cover Comber (4 miles to the south-west), Bangor and Holywood.

Homes in County Down

Northern Ireland has a high proportion of detached houses and bungalows outside the cities, which often suit side extensions, rear extensions and upward extensions.

What does a single-storey extension involve?

A single-storey extension adds one level of new floor space to the back or side of a house, usually to open up a kitchen, dining or family room. It is the most common way to gain space without moving, and many can be built without a planning application.

  • Building control application and inspections
  • Foundations, drainage and structural steel
  • First-fix and second-fix electrics, plastering and making good

How much should I budget for a single-storey extension?

Typical ranges for single-storey extensions. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.

Single-storey extensionsGuide price incl. VAT
Standard specification£2,600 to £3,000 per m²
Good specification£3,000 to £3,500 per m²
High specification£3,500 to £4,000 per m²

Planning and building rules in Newtownards

In Northern Ireland the council handles both planning and building control. Permitted development rules are set by the Planning (General Permitted Development) Order (Northern Ireland) 2015, and there is no party wall act, so we agree access and protection with neighbours in writing.

In Northern Ireland permitted development is set by the Planning (General Permitted Development) Order (Northern Ireland) 2015, and small single-storey rear extensions can often go ahead without an application.

What can affect a single-storey extension?

  • Drains under the footprint may need diverting or a build-over agreement with the water company.
  • Kitchens and doors have long lead times, so we order them early.

From first call to completion

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Single-storey extensions: common questions

How long does a single-storey extension take to build?

The build itself usually takes 10 to 16 weeks once work starts on site. Design, approvals and ordering usually add 6 to 12 weeks before that.

Will the brick match?

We source the closest available match for colour, size and texture and agree a sample panel with you before laying.

Who deals with the council for a project in Newtownards?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Also covering

Learn more about single-storey extensions, or see every project we cover in Newtownards.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote