Covering Rayleigh
Alongside Rayleigh, we also cover South Benfleet, Wickford (4 miles to the north-west) and Pitsea.
Homes in the East of England
Across the East of England, newer estates often have integral garages and room for rear extensions, while older towns have Victorian terraces and conservation areas that shape what can be built.
What does a single-storey extension involve?
We design the extension around how you use the house: where the light comes from, how the new room joins the old one, and what happens to the drains and the garden. The structure is built in brick or block to match the house, finished with a flat roof and lantern or a pitched roof, then insulated, plastered and handed back ready to decorate.
- Measured survey and design drawings
- Planning or lawful development certificate where needed
- First-fix and second-fix electrics, plastering and making good
What is the guide price for a single-storey extension in Rayleigh?
What single-storey extensions typically cost. These are guide ranges; the written quote for your house replaces them.
| Single-storey extensions | Guide price incl. VAT |
|---|---|
| Standard specification | £2,600 to £3,000 per m² |
| Good specification | £3,000 to £3,500 per m² |
| High specification | £3,500 to £4,000 per m² |
Do you need permission for a single-storey extension in Rayleigh?
In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.
In England a single-storey rear extension can often go ahead under permitted development: up to 3 m deep on an attached house or 4 m on a detached one, no higher than 4 m, with eaves no higher than 3 m within 2 m of a boundary.
What should Rayleigh homeowners check first?
- Drains under the footprint may need diverting or a build-over agreement with the water company.
- Building on or near a shared boundary usually means serving a party wall notice in England and Wales.
What are the steps?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Single-storey extensions: common questions
How long does a single-storey extension take to build?
The build itself usually takes 10 to 16 weeks once work starts on site. Design, approvals and ordering usually add 6 to 12 weeks before that.
Can we stay in the house during the build?
Usually yes. We keep the existing house closed off from the works until the knock-through near the end, and agree a temporary kitchen set-up with you if the kitchen is affected.
Who deals with the council for a project in Rayleigh?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
Single-storey extensions in nearby towns
- Single-storey extensions in South Benfleet
- Single-storey extensions in Wickford
- Single-storey extensions in Pitsea
- Single-storey extensions in Canvey Island
Learn more about single-storey extensions, or see every project we cover in Rayleigh.

