Single-storey extensions · Renfrew

Single-storey extensions in Renfrew

Single-storey extensions in Renfrew from SK Residential: design, approvals and the build handled under one contract, with one point of contact from the first visit to completion.

Covering Renfrew

Our coverage around Renfrew (PA4) also includes Clydebank (2 miles to the north) and Paisley.

Homes in Renfrewshire and Inverclyde

Scottish homes range from city tenements and sandstone terraces to bungalows and modern estates, and the building warrant process shapes the programme for every project.

What do you get with a single-storey extension?

We design the extension around how you use the house: where the light comes from, how the new room joins the old one, and what happens to the drains and the garden. The structure is built in brick or block to match the house, finished with a flat roof and lantern or a pitched roof, then insulated, plastered and handed back ready to decorate.

  • Building warrant application and completion certificate
  • Building control application and inspections
  • Foundations, drainage and structural steel

How much should I budget for a single-storey extension?

Typical ranges for single-storey extensions. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.

Single-storey extensionsGuide price incl. VAT
Standard specification£2,600 to £3,000 per m²
Good specification£3,000 to £3,500 per m²
High specification£3,500 to £4,000 per m²

How is a single-storey extension approved in Renfrew?

Projects in Scotland need a building warrant from the council before any building work starts, and a completion certificate once it is finished. Planning permission is a separate decision. The Party Wall etc. Act does not apply in Scotland; shared walls are governed by title deeds and the law of the tenement where relevant.

Scotland has its own householder permitted development rules, and small single-storey rear extensions are often covered.

What can affect a single-storey extension?

  • Drains under the footprint may need diverting or a build-over agreement with the water company.
  • Large glazed areas need to meet energy rules, which can shape the size of doors and rooflights.

From first call to completion

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

Your questions answered

How long does a single-storey extension take to build?

The build itself usually takes 10 to 16 weeks once work starts on site. Design, approvals and ordering usually add 6 to 12 weeks before that.

Can we stay in the house during the build?

Usually yes. We keep the existing house closed off from the works until the knock-through near the end, and agree a temporary kitchen set-up with you if the kitchen is affected.

Can you visit a house in Renfrew to quote?

Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.

Also covering

Learn more about single-storey extensions, or see every project we cover in Renfrew.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote