Single-storey extensions · St Austell

Single-storey extensions in St Austell

If you live in St Austell and want single-storey extensions, we can take the whole job off your hands, from measuring the house to handing over a finished room.

Covering St Austell

St Austell is about 13 miles north-east of Truro. We also cover Bodmin (9 miles to the north), Truro and Falmouth.

Because Cornwall covers a wide area, we confirm availability after the first call and include any travel costs in the written quote rather than adding them later.

Homes in the South West

In the South West, matching local stone, render or slate is often the main design question, and conservation areas and listed buildings are common in historic towns.

What do you get with a single-storey extension?

A single-storey extension adds one level of new floor space to the back or side of a house, usually to open up a kitchen, dining or family room. It is the most common way to gain space without moving, and many can be built without a planning application.

  • Measured survey and design drawings
  • Building control application and inspections
  • Brickwork, roof, glazing and insulation

How much should I budget for a single-storey extension?

Guide prices for single-storey extensions, including VAT where it applies. Your fixed price is confirmed in writing after the survey.

Single-storey extensionsGuide price incl. VAT
Standard specification£2,600 to £3,000 per m²
Good specification£3,000 to £3,500 per m²
High specification£3,500 to £4,000 per m²

How is a single-storey extension approved in St Austell?

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

In England a single-storey rear extension can often go ahead under permitted development: up to 3 m deep on an attached house or 4 m on a detached one, no higher than 4 m, with eaves no higher than 3 m within 2 m of a boundary.

What should I think about before starting?

  • Large glazed areas need to meet energy rules, which can shape the size of doors and rooflights.
  • Kitchens and doors have long lead times, so we order them early.

How does the project run?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Single-storey extensions: common questions

How long does a single-storey extension take to build?

The build itself usually takes 10 to 16 weeks once work starts on site. Design, approvals and ordering usually add 6 to 12 weeks before that.

Will the brick match?

We source the closest available match for colour, size and texture and agree a sample panel with you before laying.

Who deals with the council for a project in St Austell?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Single-storey extensions near St Austell

Learn more about single-storey extensions, or see every project we cover in St Austell.