Covering Stamford Hill
Alongside Stamford Hill, we also cover Highbury, Tottenham (2 miles to the north) and Holloway.
Homes in London
London projects often mean working on period terraces with neighbours on both sides, tight access through the house and conservation area controls, so careful planning and party wall work matter as much as the build.
What do you get with a single-storey extension?
A single-storey extension adds one level of new floor space to the back or side of a house, usually to open up a kitchen, dining or family room. It is the most common way to gain space without moving, and many can be built without a planning application.
- Measured survey and design drawings
- Building control application and inspections
- First-fix and second-fix electrics, plastering and making good
How much does a single-storey extension cost in Stamford Hill?
Typical ranges for single-storey extensions. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.
| Single-storey extensions | Guide price incl. VAT |
|---|---|
| Standard specification | £2,600 to £3,000 per m² |
| Good specification | £3,000 to £3,500 per m² |
| High specification | £3,500 to £4,000 per m² |
Planning and building rules in Stamford Hill
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
In England a single-storey rear extension can often go ahead under permitted development: up to 3 m deep on an attached house or 4 m on a detached one, no higher than 4 m, with eaves no higher than 3 m within 2 m of a boundary. Deeper extensions, up to 6 m or 8 m, need prior approval from the council first.
What should Stamford Hill homeowners check first?
- Drains under the footprint may need diverting or a build-over agreement with the water company.
- Large glazed areas need to meet energy rules, which can shape the size of doors and rooflights.
From first call to completion
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
What people ask before starting
Do I need planning permission for a single-storey extension?
Often not in England, if the extension stays within permitted development limits: 3 m deep on an attached house or 4 m on a detached house, and no higher than 4 m. Larger ones need prior approval or a planning application. Wales, Scotland and Northern Ireland have their own rules.
Can we stay in the house during the build?
Usually yes. We keep the existing house closed off from the works until the knock-through near the end, and agree a temporary kitchen set-up with you if the kitchen is affected.
Do you work in Stamford Hill?
Yes. Stamford Hill is within our coverage for single-storey extensions, along with nearby Highbury and Tottenham.
Other towns nearby
- Single-storey extensions in Highbury
- Single-storey extensions in Tottenham
- Single-storey extensions in Holloway
- Single-storey extensions in Islington
Learn more about single-storey extensions, or see every project we cover in Stamford Hill.

