Covering Strood
We work in Strood (ME2) and the places around it, including Rochester, Chatham and Gillingham.
Homes in the South East
The South East has a lot of 1930s and post-war semi-detached housing, well suited to rear extensions and hip-to-gable loft conversions, alongside period properties in conservation areas that need a more careful design.
What goes into a single-storey extension?
We design the extension around how you use the house: where the light comes from, how the new room joins the old one, and what happens to the drains and the garden. The structure is built in brick or block to match the house, finished with a flat roof and lantern or a pitched roof, then insulated, plastered and handed back ready to decorate.
- Planning or lawful development certificate where needed
- Building control application and inspections
- Foundations, drainage and structural steel
How much does a single-storey extension cost in Strood?
Guide prices for single-storey extensions, including VAT where it applies. Your fixed price is confirmed in writing after the survey.
| Single-storey extensions | Guide price incl. VAT |
|---|---|
| Standard specification | £2,600 to £3,000 per m² |
| Good specification | £3,000 to £3,500 per m² |
| High specification | £3,500 to £4,000 per m² |
Do you need permission for a single-storey extension in Strood?
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
In England a single-storey rear extension can often go ahead under permitted development: up to 3 m deep on an attached house or 4 m on a detached one, no higher than 4 m, with eaves no higher than 3 m within 2 m of a boundary.
What should Strood homeowners check first?
- Building on or near a shared boundary usually means serving a party wall notice in England and Wales.
- Kitchens and doors have long lead times, so we order them early.
How does the project run?
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
What people ask before starting
Can we stay in the house during the build?
Usually yes. We keep the existing house closed off from the works until the knock-through near the end, and agree a temporary kitchen set-up with you if the kitchen is affected.
Do you need to dig up the drains?
Sometimes. If a public sewer runs under the extension, the water company has to agree a build-over or a diversion. We check this at survey stage.
Do you work in Strood?
Yes. Strood is within our coverage for single-storey extensions, along with nearby Rochester and Chatham.
Also covering
- Single-storey extensions in Rochester
- Single-storey extensions in Chatham
- Single-storey extensions in Gillingham
- Single-storey extensions in Gravesend
Learn more about single-storey extensions, or see every project we cover in Strood.

