Structural alterations · Bognor Regis

Structural alterations in Bognor Regis

Homeowners in Bognor Regis can get structural alterations from one company: the design, the paperwork and the building work sit with us rather than with three separate firms.

Covering Bognor Regis

Bognor Regis is about 31 miles south-west of Crawley. We also cover Chichester (6 miles to the north-west), Littlehampton and Worthing.

Homes in the South East

Many South East homes are inter-war or post-war semis and detached houses with room for rear and side extensions, while historic town centres and villages bring conservation area and listed building controls.

What goes into a structural alteration?

Structural alterations change the load-bearing parts of a house, most often removing a wall between two rooms and putting in a steel beam to create an open-plan layout. The work needs a structural engineer’s design and building regulations approval.

  • Building control application and inspections
  • Temporary works and propping
  • Fire protection and plaster encasement

How much should I budget for a structural alteration?

Guide prices for structural alterations, including VAT where it applies. Your fixed price is confirmed in writing after the survey.

Structural alterationsGuide price incl. VAT
Single load-bearing wall removal with steel£3,000 to £7,500
Chimney breast removal with support£1,800 to £4,500
Multiple walls or full open-plan remodel£8,000 to £20,000

Do you need permission for a structural alteration in Bognor Regis?

In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.

Internal work like this does not usually need planning permission unless the house is listed or your permitted development rights have been removed.

What should Bognor Regis homeowners check first?

  • The beam size can mean a downstand in the ceiling unless it is set flush within the floor.
  • Removing walls can affect the fire escape route on open-plan ground floors in three-storey houses.

What are the steps?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Your questions answered

How long does it take?

The structural work is usually done in a few days, with one to three weeks including making good.

Can the steel be hidden in the ceiling?

Often it can be set within the floor depth, avoiding a downstand. The engineer confirms what is possible.

Do you work in Bognor Regis?

Yes. Bognor Regis is within our coverage for structural alterations, along with nearby Chichester and Littlehampton.

Also covering

Learn more about structural alterations, or see every project we cover in Bognor Regis.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote