Structural alterations · Burntwood

Structural alterations in Burntwood

Our structural alterations service covers Burntwood and the rest of Staffordshire. You get a fixed price in writing for the agreed specification, and one person co-ordinating the trades.

Covering Burntwood

We work in Burntwood (WS7) and the places around it, including Lichfield, Cannock and Aldridge.

Homes in the West Midlands

Across the West Midlands, terraced and semi-detached houses in red brick are typical, along with post-war estates where garage conversions and side extensions are popular.

What goes into a structural alteration?

We arrange the structural calculations, support the floors and roof above with temporary props while the wall comes out, install the steel on padstones, then encase it for fire protection and make good. Chimney breast removals and new openings in external walls follow the same process.

  • Temporary works and propping
  • Steel beam installation on padstones
  • Making good floors, walls and ceilings

What is the guide price for a structural alteration in Burntwood?

Indicative costs for structural alterations. London and the South East usually sit towards the top of each range.

Structural alterationsGuide price incl. VAT
Single load-bearing wall removal with steel£3,000 to £7,500
Chimney breast removal with support£1,800 to £4,500
Multiple walls or full open-plan remodel£8,000 to £20,000

What approvals does a structural alteration need in England?

English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.

Internal work like this does not usually need planning permission unless the house is listed or your permitted development rights have been removed. It does need building regulations approval because it affects the structure.

What should I think about before starting?

  • Shared chimney breasts and walls can involve the Party Wall Act.
  • Removing walls can affect the fire escape route on open-plan ground floors in three-storey houses.

How does the project run?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

What people ask before starting

How long does it take?

The structural work is usually done in a few days, with one to three weeks including making good.

Can the steel be hidden in the ceiling?

Often it can be set within the floor depth, avoiding a downstand. The engineer confirms what is possible.

Can you visit a house in Burntwood to quote?

Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.

Also covering

Learn more about structural alterations, or see every project we cover in Burntwood.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote