Covering Canterbury
Our coverage around Canterbury (CT1) also includes Whitstable (6 miles to the north) and Herne Bay.
Homes in the South East
Housing across the South East mixes inter-war semis, post-war estates and older cottages in villages and market towns, so rear and side extensions, hip-to-gable lofts and garage conversions all come up regularly.
What is a structural alteration?
Structural alterations change the load-bearing parts of a house, most often removing a wall between two rooms and putting in a steel beam to create an open-plan layout. The work needs a structural engineer’s design and building regulations approval.
- Temporary works and propping
- Steel beam installation on padstones
- Fire protection and plaster encasement
What will a structural alteration cost?
Typical ranges for structural alterations. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.
| Structural alterations | Guide price incl. VAT |
|---|---|
| Single load-bearing wall removal with steel | £3,000 to £7,500 |
| Chimney breast removal with support | £1,800 to £4,500 |
| Multiple walls or full open-plan remodel | £8,000 to £20,000 |
Planning and building rules in Canterbury
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
Internal work like this does not usually need planning permission unless the house is listed or your permitted development rights have been removed.
What can affect a structural alteration?
- The beam size can mean a downstand in the ceiling unless it is set flush within the floor.
- Removing walls can affect the fire escape route on open-plan ground floors in three-storey houses.
What happens after I enquire?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
Structural alterations: common questions
Do I need building regulations approval to remove a wall?
Yes, for any load-bearing wall. Non-structural partitions usually do not need approval.
How long does it take?
The structural work is usually done in a few days, with one to three weeks including making good.
Can you visit a house in Canterbury to quote?
Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.
Other towns nearby
- Structural alterations in Whitstable
- Structural alterations in Herne Bay
- Structural alterations in Faversham
- Structural alterations in Ashford
Learn more about structural alterations, or see every project we cover in Canterbury.

