What is a structural alteration?
Structural alterations change the load-bearing parts of a house, most often removing a wall between two rooms and putting in a steel beam to create an open-plan layout. The work needs a structural engineer’s design and building regulations approval.
- Structural engineer’s design and calculations
- Fire protection and plaster encasement
- Making good floors, walls and ceilings
How much should I budget for a structural alteration?
Typical ranges for structural alterations. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.
| Structural alterations | Guide price incl. VAT |
|---|---|
| Single load-bearing wall removal with steel | £3,000 to £7,500 |
| Chimney breast removal with support | £1,800 to £4,500 |
| Multiple walls or full open-plan remodel | £8,000 to £20,000 |
Do you need permission for a structural alteration in Ilford?
In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.
Internal work like this does not usually need planning permission unless the house is listed or your permitted development rights have been removed. It does need building regulations approval because it affects the structure.
What should Ilford homeowners check first?
- Shared chimney breasts and walls can involve the Party Wall Act.
- The beam size can mean a downstand in the ceiling unless it is set flush within the floor.
What are the steps?
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
Your questions answered
How long does it take?
The structural work is usually done in a few days, with one to three weeks including making good.
Can the steel be hidden in the ceiling?
Often it can be set within the floor depth, avoiding a downstand. The engineer confirms what is possible.
Who deals with the council for a project in Ilford?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
Also covering
- Structural alterations in Barking
- Structural alterations in Becontree
- Structural alterations in Leytonstone
- Structural alterations in Stratford
Learn more about structural alterations, or see every project we cover in Ilford.