Covering Peebles
Peebles sits 22 miles north-west of Hawick, with Galashiels 15 miles to the east and Selkirk 15 miles to the south-east.
Because the Scottish Borders covers a wide area, we confirm availability after the first call and include any travel costs in the written quote rather than adding them later.
Homes in the Scottish Borders
Scottish homes range from city tenements and sandstone terraces to bungalows and modern estates, and the building warrant process shapes the programme for every project.
What is included in a structural alteration in Peebles?
Structural alterations change the load-bearing parts of a house, most often removing a wall between two rooms and putting in a steel beam to create an open-plan layout. The work needs a structural engineer’s design and building regulations approval.
- Structural engineer’s design and calculations
- Building control application and inspections
- Making good floors, walls and ceilings
How much should I budget for a structural alteration?
Typical ranges for structural alterations. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.
| Structural alterations | Guide price incl. VAT |
|---|---|
| Single load-bearing wall removal with steel | £3,000 to £7,500 |
| Chimney breast removal with support | £1,800 to £4,500 |
| Multiple walls or full open-plan remodel | £8,000 to £20,000 |
How is a structural alteration approved in Peebles?
Projects in Scotland need a building warrant from the council before any building work starts, and a completion certificate once it is finished. Planning permission is a separate decision. The Party Wall etc. Act does not apply in Scotland; shared walls are governed by title deeds and the law of the tenement where relevant.
Internal alterations rarely need planning permission in Scotland, but structural work needs a building warrant before it starts.
What can affect a structural alteration?
- The beam size can mean a downstand in the ceiling unless it is set flush within the floor.
- Removing walls can affect the fire escape route on open-plan ground floors in three-storey houses.
How does the project run?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
Structural alterations: common questions
How do I know if a wall is load-bearing?
We check on site and confirm with the structural engineer.
How long does it take?
The structural work is usually done in a few days, with one to three weeks including making good.
How do I get a price for structural alterations in Peebles?
Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.
Also covering
- Structural alterations in Galashiels
- Structural alterations in Selkirk
- Structural alterations in Bonnyrigg
- Structural alterations in Dalkeith
Learn more about structural alterations, or see every project we cover in Peebles.

