Structural alterations · Richmond

Structural alterations in Richmond

From the first site visit to the final building control sign-off, we manage structural alterations in Richmond so you only have one company to deal with.

Covering Richmond

Richmond is about 8 miles west of London. We also cover Isleworth (2 miles to the north-west), Hounslow and Barnes.

Homes in London

Much of London’s housing is Victorian and Edwardian terraces, which is why side return extensions, rear dormers and mansards are so common. Many streets are in conservation areas, and several boroughs use Article 4 directions that remove some permitted development rights.

What does a structural alteration involve?

Structural alterations change the load-bearing parts of a house, most often removing a wall between two rooms and putting in a steel beam to create an open-plan layout. The work needs a structural engineer’s design and building regulations approval.

  • Structural engineer’s design and calculations
  • Steel beam installation on padstones
  • Fire protection and plaster encasement

What will a structural alteration cost?

Guide prices for structural alterations, including VAT where it applies. Your fixed price is confirmed in writing after the survey.

Structural alterationsGuide price incl. VAT
Single load-bearing wall removal with steel£3,000 to £7,500
Chimney breast removal with support£1,800 to £4,500
Multiple walls or full open-plan remodel£8,000 to £20,000

How is a structural alteration approved in Richmond?

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

Internal work like this does not usually need planning permission unless the house is listed or your permitted development rights have been removed. It does need building regulations approval because it affects the structure.

What should I think about before starting?

  • The beam size can mean a downstand in the ceiling unless it is set flush within the floor.
  • Pipes and cables in the wall need rerouting first.

What are the steps?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

Your questions answered

Do I need building regulations approval to remove a wall?

Yes, for any load-bearing wall. Non-structural partitions usually do not need approval.

How long does it take?

The structural work is usually done in a few days, with one to three weeks including making good.

Who deals with the council for a project in Richmond?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Structural alterations in nearby towns

Learn more about structural alterations, or see every project we cover in Richmond.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote