Covering Rugby
Rugby sits 14 miles south-east of Nuneaton, with Daventry 9 miles to the south-east and Coventry 11 miles to the west.
Homes in the West Midlands
Red-brick terraces and inter-war semis make up much of the housing in the West Midlands, which suits rear extensions, dormer lofts and hip-to-gable conversions, with more modern estates on the edges of the towns.
What is a structural alteration?
We arrange the structural calculations, support the floors and roof above with temporary props while the wall comes out, install the steel on padstones, then encase it for fire protection and make good. Chimney breast removals and new openings in external walls follow the same process.
- Building control application and inspections
- Fire protection and plaster encasement
- Making good floors, walls and ceilings
What will a structural alteration cost?
Indicative costs for structural alterations. London and the South East usually sit towards the top of each range.
| Structural alterations | Guide price incl. VAT |
|---|---|
| Single load-bearing wall removal with steel | £3,000 to £7,500 |
| Chimney breast removal with support | £1,800 to £4,500 |
| Multiple walls or full open-plan remodel | £8,000 to £20,000 |
What approvals does a structural alteration need in England?
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
Internal work like this does not usually need planning permission unless the house is listed or your permitted development rights have been removed. It does need building regulations approval because it affects the structure.
What should I think about before starting?
- The beam size can mean a downstand in the ceiling unless it is set flush within the floor.
- Removing walls can affect the fire escape route on open-plan ground floors in three-storey houses.
How does the project run?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Your questions answered
Do I need building regulations approval to remove a wall?
Yes, for any load-bearing wall. Non-structural partitions usually do not need approval.
How long does it take?
The structural work is usually done in a few days, with one to three weeks including making good.
How do I get a price for structural alterations in Rugby?
Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.
Other towns nearby
- Structural alterations in Daventry
- Structural alterations in Coventry
- Structural alterations in Bedworth
- Structural alterations in Leamington Spa
Learn more about structural alterations, or see every project we cover in Rugby.

