Structural alterations · Speke

Structural alterations in Speke

If you live in Speke and want structural alterations, we can take the whole job off your hands, from measuring the house to handing over a finished room.

Covering Speke

Alongside Speke, we also cover Garston, Runcorn (5 miles to the east) and Widnes.

Homes in the North West

Terraced housing is a defining feature of many North West towns, which brings party walls and narrow access into most projects, with more space to extend on suburban semis.

What does a structural alteration involve?

Structural alterations change the load-bearing parts of a house, most often removing a wall between two rooms and putting in a steel beam to create an open-plan layout. The work needs a structural engineer’s design and building regulations approval.

  • Building control application and inspections
  • Steel beam installation on padstones
  • Fire protection and plaster encasement

What will a structural alteration cost?

Indicative costs for structural alterations. London and the South East usually sit towards the top of each range.

Structural alterationsGuide price incl. VAT
Single load-bearing wall removal with steel£3,000 to £7,500
Chimney breast removal with support£1,800 to £4,500
Multiple walls or full open-plan remodel£8,000 to £20,000

Do you need permission for a structural alteration in Speke?

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

Internal work like this does not usually need planning permission unless the house is listed or your permitted development rights have been removed. It does need building regulations approval because it affects the structure.

What can change the price or programme?

  • Shared chimney breasts and walls can involve the Party Wall Act.
  • Pipes and cables in the wall need rerouting first.

What are the steps?

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

Questions about a structural alteration in Speke

Do I need building regulations approval to remove a wall?

Yes, for any load-bearing wall. Non-structural partitions usually do not need approval.

How long does it take?

The structural work is usually done in a few days, with one to three weeks including making good.

How do I get a price for structural alterations in Speke?

Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.

Other towns nearby

Learn more about structural alterations, or see every project we cover in Speke.