Structural alterations · Wantage

Structural alterations in Wantage

Structural alterations in Wantage from SK Residential: design, approvals and the build handled under one contract, with one point of contact from the first visit to completion.

Covering Wantage

Wantage is about 13 miles south-west of Oxford. We also cover Didcot (8 miles to the east), Abingdon and Oxford.

Homes in the South East

The South East has a lot of 1930s and post-war semi-detached housing, well suited to rear extensions and hip-to-gable loft conversions, alongside period properties in conservation areas that need a more careful design.

What does a structural alteration involve?

Structural alterations change the load-bearing parts of a house, most often removing a wall between two rooms and putting in a steel beam to create an open-plan layout. The work needs a structural engineer’s design and building regulations approval.

  • Structural engineer’s design and calculations
  • Steel beam installation on padstones
  • Making good floors, walls and ceilings

What is the guide price for a structural alteration in Wantage?

Use these ranges to budget for structural alterations; the survey turns them into a fixed price for the agreed specification.

Structural alterationsGuide price incl. VAT
Single load-bearing wall removal with steel£3,000 to £7,500
Chimney breast removal with support£1,800 to £4,500
Multiple walls or full open-plan remodel£8,000 to £20,000

Do you need permission for a structural alteration in Wantage?

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

Internal work like this does not usually need planning permission unless the house is listed or your permitted development rights have been removed. It does need building regulations approval because it affects the structure.

What should I think about before starting?

  • Removing walls can affect the fire escape route on open-plan ground floors in three-storey houses.
  • Pipes and cables in the wall need rerouting first.

What are the steps?

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

Questions about a structural alteration in Wantage

How do I know if a wall is load-bearing?

We check on site and confirm with the structural engineer.

How long does it take?

The structural work is usually done in a few days, with one to three weeks including making good.

Who deals with the council for a project in Wantage?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Structural alterations near Wantage

Learn more about structural alterations, or see every project we cover in Wantage.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote