Structural alterations · Wellington

Structural alterations in Wellington

Structural alterations for homes in Wellington and the surrounding parts of Shropshire, designed around your house and built by our teams under a single written contract.

Covering Wellington

Our coverage around Wellington (TF1) also includes Telford, Shrewsbury and Bridgnorth.

Homes in the West Midlands

Across the West Midlands, terraced and semi-detached houses in red brick are typical, along with post-war estates where garage conversions and side extensions are popular.

What is a structural alteration?

We arrange the structural calculations, support the floors and roof above with temporary props while the wall comes out, install the steel on padstones, then encase it for fire protection and make good. Chimney breast removals and new openings in external walls follow the same process.

  • Building control application and inspections
  • Temporary works and propping
  • Fire protection and plaster encasement

How much should I budget for a structural alteration?

Indicative costs for structural alterations. London and the South East usually sit towards the top of each range.

Structural alterationsGuide price incl. VAT
Single load-bearing wall removal with steel£3,000 to £7,500
Chimney breast removal with support£1,800 to £4,500
Multiple walls or full open-plan remodel£8,000 to £20,000

Planning and building rules in Wellington

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

Internal work like this does not usually need planning permission unless the house is listed or your permitted development rights have been removed. It does need building regulations approval because it affects the structure.

What can change the price or programme?

  • The beam size can mean a downstand in the ceiling unless it is set flush within the floor.
  • Removing walls can affect the fire escape route on open-plan ground floors in three-storey houses.

How does the project run?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Your questions answered

How much does it cost to remove a load-bearing wall?

Usually £3,000 to £7,500 including VAT for a single wall with a steel beam, calculations and making good.

How long does it take?

The structural work is usually done in a few days, with one to three weeks including making good.

Can you visit a house in Wellington to quote?

Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.

Other towns nearby

Learn more about structural alterations, or see every project we cover in Wellington.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote