Covering Bath
We work in Bath (BA1) and the places around it, including Trowbridge, Kingswood and Corsham.
Homes in the South West
In the South West, matching local stone, render or slate is often the main design question, and conservation areas and listed buildings are common in historic towns.
What is included in a wraparound extension in Bath?
Because it removes two external walls, a wraparound needs careful structural design and a good plan for the corner where the steels meet. We design, apply for any permissions, build and finish the shell, and can fit the kitchen as part of the same contract.
- Design, planning drawings and structural calculations
- Pitched, flat or glazed roof with rooflights
- Optional kitchen supply and installation
How much does a wraparound extension cost in Bath?
What wraparound extensions typically cost. These are guide ranges; the written quote for your house replaces them.
| Wraparound extensions | Guide price incl. VAT |
|---|---|
| Standard specification | £3,400 to £3,800 per m² |
| Good specification | £3,800 to £4,250 per m² |
| High specification | £4,250 to £4,700 per m² |
How is a wraparound extension approved in Bath?
In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.
In England a wraparound extension is treated as one extension, and because it covers both the side and the rear it does not normally fit within permitted development. Most need householder planning permission, which usually takes around eight weeks once validated.
What should Bath homeowners check first?
- Both neighbours may need party wall notices.
- Roof water from an L-shape needs careful falls and outlets.
From first call to completion
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
What people ask before starting
Does a wraparound need planning permission?
Usually yes. In England it combines a side and rear extension, which takes it outside permitted development in most cases.
Can we keep part of the kitchen working?
Often, by sequencing the work so the old back wall comes out last. We agree a plan with you before starting.
Who deals with the council for a project in Bath?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
Wraparound extensions near Bath
- Wraparound extensions in Trowbridge
- Wraparound extensions in Kingswood
- Wraparound extensions in Corsham
- Wraparound extensions in Frome
Learn more about wraparound extensions, or see every project we cover in Bath.

