What is a wraparound extension?
A wraparound extension combines a side return and a rear extension into one L-shaped build, giving the biggest possible ground-floor space on terraced and semi-detached houses. It usually creates a large open-plan kitchen, dining and living area across the back of the house.
- Planning and building control applications to the council
- Steel frame or goalpost for the corner opening
- Glazing, insulation, plastering and electrics
How much should I budget for a wraparound extension?
Use these ranges to budget for wraparound extensions; the survey turns them into a fixed price for the agreed specification.
| Wraparound extensions | Guide price incl. VAT |
|---|---|
| Standard specification | £3,400 to £3,800 per m² |
| Good specification | £3,800 to £4,250 per m² |
| High specification | £4,250 to £4,700 per m² |
What approvals does a wraparound extension need in Northern Ireland?
In Northern Ireland the council handles both planning and building control. Permitted development rules are set by the Planning (General Permitted Development) Order (Northern Ireland) 2015, and there is no party wall act, so we agree access and protection with neighbours in writing.
In Northern Ireland permitted development is set by the Planning (General Permitted Development) Order (Northern Ireland) 2015, and small single-storey rear extensions can often go ahead without an application. Building control approval from the council is still needed.
What can change the price or programme?
- The corner steel connection is the critical detail and is designed by a structural engineer.
- An open-plan space this size needs a heating plan, often underfloor heating.
What are the steps?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
What people ask before starting
How long does a wraparound take?
Around 12 to 18 weeks on site after approvals.
Glazed roof or solid roof?
A mix usually works best: solid roof with rooflights over the kitchen and a glazed section over the dining area.
Can you visit a house in Cookstown to quote?
Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.
Wraparound extensions in nearby towns
- Wraparound extensions in Magherafelt
- Wraparound extensions in Dungannon
- Wraparound extensions in Portadown
- Wraparound extensions in Craigavon
Learn more about wraparound extensions, or see every project we cover in Cookstown.