Covering Cowbridge
We work in Cowbridge (CF71) and the places around it, including Llantwit Major, Bridgend and Barry.
Homes in South Glamorgan
Housing in Wales ranges from terraced streets in the valleys and older industrial towns to stone-built homes in rural areas and modern estates around the cities.
What do you get with a wraparound extension?
Because it removes two external walls, a wraparound needs careful structural design and a good plan for the corner where the steels meet. We design, apply for any permissions, build and finish the shell, and can fit the kitchen as part of the same contract.
- Design, planning drawings and structural calculations
- Party wall process with both neighbours if needed
- Pitched, flat or glazed roof with rooflights
What will a wraparound extension cost?
Typical ranges for wraparound extensions. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.
| Wraparound extensions | Guide price incl. VAT |
|---|---|
| Standard specification | £3,400 to £3,800 per m² |
| Good specification | £3,800 to £4,250 per m² |
| High specification | £4,250 to £4,700 per m² |
Planning and building rules in Cowbridge
Welsh projects need planning clearance from the council under Welsh rules, building regulations approval under the Welsh approved documents, and party wall notices where the work affects a neighbour’s wall or foundations.
Wales has its own permitted development rules, set by the Welsh Government.
What can affect a wraparound extension?
- The corner steel connection is the critical detail and is designed by a structural engineer.
- An open-plan space this size needs a heating plan, often underfloor heating.
What happens after I enquire?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
What people ask before starting
How long does a wraparound take?
Around 12 to 18 weeks on site after approvals.
Glazed roof or solid roof?
A mix usually works best: solid roof with rooflights over the kitchen and a glazed section over the dining area.
How do I get a price for wraparound extensions in Cowbridge?
Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.
Wraparound extensions near Cowbridge
- Wraparound extensions in Llantwit Major
- Wraparound extensions in Bridgend
- Wraparound extensions in Barry
- Wraparound extensions in Whitchurch
Learn more about wraparound extensions, or see every project we cover in Cowbridge.

