Covering Derby
We work in Derby (DE1) and the places around it, including Belper, Ilkeston and Heanor.
Homes in the East Midlands
The East Midlands combines red-brick terraces in the cities with a lot of post-war and modern estate housing, so rear extensions, garage conversions and loft conversions are all common.
What does a wraparound extension involve?
A wraparound extension combines a side return and a rear extension into one L-shaped build, giving the biggest possible ground-floor space on terraced and semi-detached houses. It usually creates a large open-plan kitchen, dining and living area across the back of the house.
- Design, planning drawings and structural calculations
- Party wall process with both neighbours if needed
- Steel frame or goalpost for the corner opening
How much should I budget for a wraparound extension?
What wraparound extensions typically cost. These are guide ranges; the written quote for your house replaces them.
| Wraparound extensions | Guide price incl. VAT |
|---|---|
| Standard specification | £3,400 to £3,800 per m² |
| Good specification | £3,800 to £4,250 per m² |
| High specification | £4,250 to £4,700 per m² |
Planning and building rules in Derby
English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.
In England a wraparound extension is treated as one extension, and because it covers both the side and the rear it does not normally fit within permitted development. Most need householder planning permission, which usually takes around eight weeks once validated.
What can change the price or programme?
- Both neighbours may need party wall notices.
- Roof water from an L-shape needs careful falls and outlets.
How does the project run?
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Your questions answered
How long does a wraparound take?
Around 12 to 18 weeks on site after approvals.
Can we keep part of the kitchen working?
Often, by sequencing the work so the old back wall comes out last. We agree a plan with you before starting.
Do you work in Derby?
Yes. Derby is within our coverage for wraparound extensions, along with nearby Belper and Ilkeston.
Other towns nearby
- Wraparound extensions in Belper
- Wraparound extensions in Ilkeston
- Wraparound extensions in Heanor
- Wraparound extensions in Ripley
Learn more about wraparound extensions, or see every project we cover in Derby.