Covering Dewsbury
We work in Dewsbury (WF12) and the places around it, including Batley, Ossett and Morley.
Homes in Yorkshire and the Humber
Stone-built terraces are typical of many West Yorkshire towns, while red brick dominates in Hull and much of South Yorkshire, so matching materials is a big part of designing an extension here.
What does a wraparound extension involve?
Because it removes two external walls, a wraparound needs careful structural design and a good plan for the corner where the steels meet. We design, apply for any permissions, build and finish the shell, and can fit the kitchen as part of the same contract.
- Design, planning drawings and structural calculations
- Steel frame or goalpost for the corner opening
- Optional kitchen supply and installation
How much should I budget for a wraparound extension?
Use these ranges to budget for wraparound extensions; the survey turns them into a fixed price for the agreed specification.
| Wraparound extensions | Guide price incl. VAT |
|---|---|
| Standard specification | £3,400 to £3,800 per m² |
| Good specification | £3,800 to £4,250 per m² |
| High specification | £4,250 to £4,700 per m² |
Planning and building rules in Dewsbury
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
In England a wraparound extension is treated as one extension, and because it covers both the side and the rear it does not normally fit within permitted development.
What should Dewsbury homeowners check first?
- Both neighbours may need party wall notices.
- An open-plan space this size needs a heating plan, often underfloor heating.
What are the steps?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
Wraparound extensions: common questions
Does a wraparound need planning permission?
Usually yes. In England it combines a side and rear extension, which takes it outside permitted development in most cases.
How long does a wraparound take?
Around 12 to 18 weeks on site after approvals.
Do you work in Dewsbury?
Yes. Dewsbury is within our coverage for wraparound extensions, along with nearby Batley and Ossett.
Also covering
- Wraparound extensions in Batley
- Wraparound extensions in Ossett
- Wraparound extensions in Morley
- Wraparound extensions in Cleckheaton
Learn more about wraparound extensions, or see every project we cover in Dewsbury.

