Covering Elgin
Our coverage around Elgin (IV30) also includes Lossiemouth, Forres and Buckie.
Because Moray covers a wide area, we confirm availability after the first call and include any travel costs in the written quote rather than adding them later.
Homes in Moray
Housing in Scotland includes tenements in the cities, sandstone villas, inter-war and post-war semis and a large number of bungalows, which often suit dormer and upward extensions.
What is a wraparound extension?
Because it removes two external walls, a wraparound needs careful structural design and a good plan for the corner where the steels meet. We design, apply for any permissions, build and finish the shell, and can fit the kitchen as part of the same contract.
- Building warrant application and completion certificate
- Steel frame or goalpost for the corner opening
- Pitched, flat or glazed roof with rooflights
How much should I budget for a wraparound extension?
What wraparound extensions typically cost. These are guide ranges; the written quote for your house replaces them.
| Wraparound extensions | Guide price incl. VAT |
|---|---|
| Standard specification | £3,400 to £3,800 per m² |
| Good specification | £3,800 to £4,250 per m² |
| High specification | £4,250 to £4,700 per m² |
Planning and building rules in Elgin
Scottish projects follow a different process from England: the council issues a building warrant before work starts and accepts a completion certificate at the end, alongside any planning permission needed. We prepare both applications.
Scotland has its own householder permitted development rules, and small single-storey rear extensions are often covered.
What should Elgin homeowners check first?
- Roof water from an L-shape needs careful falls and outlets.
- An open-plan space this size needs a heating plan, often underfloor heating.
From first call to completion
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
What people ask before starting
How long does a wraparound take?
Around 12 to 18 weeks on site after approvals.
Can we keep part of the kitchen working?
Often, by sequencing the work so the old back wall comes out last. We agree a plan with you before starting.
Do you work in Elgin?
Yes. Elgin is within our coverage for wraparound extensions, along with nearby Lossiemouth and Forres.
Other towns nearby
- Wraparound extensions in Lossiemouth
- Wraparound extensions in Forres
- Wraparound extensions in Buckie
- Wraparound extensions in Nairn
Learn more about wraparound extensions, or see every project we cover in Elgin.

