Wraparound extensions · Glasgow

Wraparound extensions in Glasgow

Homeowners across Glasgow can get wraparound extensions from one company: the design, the council approvals and the building work.

Covering Glasgow

We cover homes across Glasgow, planned from survey to sign-off.

Homes in Glasgow

Scottish homes range from city tenements and sandstone terraces to bungalows and modern estates, and the building warrant process shapes the programme for every project.

What does a wraparound extension involve?

A wraparound extension combines a side return and a rear extension into one L-shaped build, giving the biggest possible ground-floor space on terraced and semi-detached houses. It usually creates a large open-plan kitchen, dining and living area across the back of the house.

  • Building warrant application and completion certificate
  • Design, planning drawings and structural calculations
  • Optional kitchen supply and installation

How much should I budget for a wraparound extension?

Typical ranges for wraparound extensions. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.

Wraparound extensionsGuide price incl. VAT
Standard specification£3,400 to £3,800 per m²
Good specification£3,800 to £4,250 per m²
High specification£4,250 to £4,700 per m²

Planning and building rules in Glasgow

In Scotland the key step is the building warrant, which must be granted before work begins. Planning permission is decided separately by the council, and work on shared walls is handled under your title deeds rather than a party wall act.

Scotland has its own householder permitted development rules, and small single-storey rear extensions are often covered.

What can affect a wraparound extension?

  • The corner steel connection is the critical detail and is designed by a structural engineer.
  • Roof water from an L-shape needs careful falls and outlets.

What are the steps?

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Your questions answered

How long does a wraparound take?

Around 12 to 18 weeks on site after approvals.

Glazed roof or solid roof?

A mix usually works best: solid roof with rooflights over the kitchen and a glazed section over the dining area.

Do you work in Glasgow?

Yes. Glasgow is within our coverage for wraparound extensions, along with nearby Glasgow and Glasgow.

Learn more about wraparound extensions, or see every project we cover in Glasgow.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote