Wraparound extensions · Great Malvern

Wraparound extensions in Great Malvern

Our wraparound extensions service covers Great Malvern and the rest of Worcestershire. You get a fixed price in writing for the agreed specification, and one person co-ordinating the trades.

Covering Great Malvern

Our coverage around Great Malvern (WR14) also includes Ledbury (7 miles to the south-west) and Worcester.

Homes in the West Midlands

Red-brick terraces and inter-war semis make up much of the housing in the West Midlands, which suits rear extensions, dormer lofts and hip-to-gable conversions, with more modern estates on the edges of the towns.

What does a wraparound extension involve?

A wraparound extension combines a side return and a rear extension into one L-shaped build, giving the biggest possible ground-floor space on terraced and semi-detached houses. It usually creates a large open-plan kitchen, dining and living area across the back of the house.

  • Design, planning drawings and structural calculations
  • Pitched, flat or glazed roof with rooflights
  • Optional kitchen supply and installation

What will a wraparound extension cost?

Typical ranges for wraparound extensions. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.

Wraparound extensionsGuide price incl. VAT
Standard specification£3,400 to £3,800 per m²
Good specification£3,800 to £4,250 per m²
High specification£4,250 to £4,700 per m²

How is a wraparound extension approved in Great Malvern?

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

In England a wraparound extension is treated as one extension, and because it covers both the side and the rear it does not normally fit within permitted development. Most need householder planning permission, which usually takes around eight weeks once validated.

What should I think about before starting?

  • Both neighbours may need party wall notices.
  • Roof water from an L-shape needs careful falls and outlets.

What are the steps?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Your questions answered

Does a wraparound need planning permission?

Usually yes. In England it combines a side and rear extension, which takes it outside permitted development in most cases.

How long does a wraparound take?

Around 12 to 18 weeks on site after approvals.

How do I get a price for wraparound extensions in Great Malvern?

Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.

Also covering

Learn more about wraparound extensions, or see every project we cover in Great Malvern.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote