Halesowen sits 7 miles west of Birmingham, with Bartley Green 2 miles to the south-east and Brierley Hill 4 miles to the north-west.
Homes in the West Midlands
The West Midlands has a large stock of 1930s semis and Victorian terraces in red brick, so matching brick and roof tiles is often the key to an extension that looks original.
What goes into a wraparound extension?
A wraparound extension combines a side return and a rear extension into one L-shaped build, giving the biggest possible ground-floor space on terraced and semi-detached houses. It usually creates a large open-plan kitchen, dining and living area across the back of the house.
- Steel frame or goalpost for the corner opening
- Pitched, flat or glazed roof with rooflights
- Glazing, insulation, plastering and electrics
What is the guide price for a wraparound extension in Halesowen?
Indicative costs for wraparound extensions. London and the South East usually sit towards the top of each range.
| Wraparound extensions | Guide price incl. VAT |
|---|---|
| Standard specification | £3,400 to £3,800 per m² |
| Good specification | £3,800 to £4,250 per m² |
| High specification | £4,250 to £4,700 per m² |
Planning and building rules in Halesowen
English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.
In England a wraparound extension is treated as one extension, and because it covers both the side and the rear it does not normally fit within permitted development.
What should I think about before starting?
- The corner steel connection is the critical detail and is designed by a structural engineer.
- An open-plan space this size needs a heating plan, often underfloor heating.
What are the steps?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
What people ask before starting
How long does a wraparound take?
Around 12 to 18 weeks on site after approvals.
Glazed roof or solid roof?
A mix usually works best: solid roof with rooflights over the kitchen and a glazed section over the dining area.
Who deals with the council for a project in Halesowen?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
Wraparound extensions in nearby towns
- Wraparound extensions in Bartley Green
- Wraparound extensions in Brierley Hill
- Wraparound extensions in Dudley
- Wraparound extensions in Stourbridge
Learn more about wraparound extensions, or see every project we cover in Halesowen.