Wraparound extensions · Hastings

Wraparound extensions in Hastings

Wraparound extensions in Hastings from SK Residential: design, approvals and the build handled under one contract, with one point of contact from the first visit to completion.

Covering Hastings

Alongside Hastings, we also cover Bexhill-on-Sea, Hailsham (14 miles to the west) and Eastbourne.

Homes in the South East

Many South East homes are inter-war or post-war semis and detached houses with room for rear and side extensions, while historic town centres and villages bring conservation area and listed building controls.

What is included in a wraparound extension in Hastings?

Because it removes two external walls, a wraparound needs careful structural design and a good plan for the corner where the steels meet. We design, apply for any permissions, build and finish the shell, and can fit the kitchen as part of the same contract.

  • Party wall process with both neighbours if needed
  • Steel frame or goalpost for the corner opening
  • Pitched, flat or glazed roof with rooflights

How much does a wraparound extension cost in Hastings?

Guide prices for wraparound extensions, including VAT where it applies. Your fixed price is confirmed in writing after the survey.

Wraparound extensionsGuide price incl. VAT
Standard specification£3,400 to £3,800 per m²
Good specification£3,800 to £4,250 per m²
High specification£4,250 to £4,700 per m²

What approvals does a wraparound extension need in England?

In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.

In England a wraparound extension is treated as one extension, and because it covers both the side and the rear it does not normally fit within permitted development. Most need householder planning permission, which usually takes around eight weeks once validated.

What should I think about before starting?

  • The corner steel connection is the critical detail and is designed by a structural engineer.
  • Both neighbours may need party wall notices.

How does the project run?

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

What people ask before starting

Does a wraparound need planning permission?

Usually yes. In England it combines a side and rear extension, which takes it outside permitted development in most cases.

Glazed roof or solid roof?

A mix usually works best: solid roof with rooflights over the kitchen and a glazed section over the dining area.

Do you work in Hastings?

Yes. Hastings is within our coverage for wraparound extensions, along with nearby Bexhill-on-Sea and Hailsham.

Wraparound extensions near Hastings

Learn more about wraparound extensions, or see every project we cover in Hastings.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.