Covering Herefordshire
Our coverage across Herefordshire includes Hereford, Leominster, Ross-on-Wye and Ledbury.
Homes in the West Midlands
The West Midlands has a large stock of 1930s semis and Victorian terraces in red brick, so matching brick and roof tiles is often the key to an extension that looks original.
What goes into a wraparound extension?
Because it removes two external walls, a wraparound needs careful structural design and a good plan for the corner where the steels meet. We design, apply for any permissions, build and finish the shell, and can fit the kitchen as part of the same contract.
- Design, planning drawings and structural calculations
- Pitched, flat or glazed roof with rooflights
- Optional kitchen supply and installation
What is the guide price for a wraparound extension in Herefordshire?
Indicative costs for wraparound extensions. London and the South East usually sit towards the top of each range.
| Wraparound extensions | Guide price incl. VAT |
|---|---|
| Standard specification | £3,400 to £3,800 per m² |
| Good specification | £3,800 to £4,250 per m² |
| High specification | £4,250 to £4,700 per m² |
What approvals does a wraparound extension need in England?
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
In England a wraparound extension is treated as one extension, and because it covers both the side and the rear it does not normally fit within permitted development. Most need householder planning permission, which usually takes around eight weeks once validated.
What can change the price or programme?
- Both neighbours may need party wall notices.
- Roof water from an L-shape needs careful falls and outlets.
How does the project run?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
Wraparound extensions: common questions
Does a wraparound need planning permission?
Usually yes. In England it combines a side and rear extension, which takes it outside permitted development in most cases.
How long does a wraparound take?
Around 12 to 18 weeks on site after approvals.
How do I get a price for wraparound extensions in Herefordshire?
Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.
Wraparound extensions in nearby towns
- Wraparound extensions in Hereford
- Wraparound extensions in Leominster
- Wraparound extensions in Ross-on-Wye
- Wraparound extensions in Ledbury
Learn more about wraparound extensions, or see every project we cover in Herefordshire.

