Wraparound extensions in Islington

We take on wraparound extensions in Islington as a complete project: survey, drawings, planning or permitted development checks, building control and the construction itself.

Covering Islington

Islington is about 2 miles north-east of London. We also cover Highbury (1 miles to the north), Holloway and Camden Town.

Homes in London

London projects often mean working on period terraces with neighbours on both sides, tight access through the house and conservation area controls, so careful planning and party wall work matter as much as the build.

What goes into a wraparound extension?

A wraparound extension combines a side return and a rear extension into one L-shaped build, giving the biggest possible ground-floor space on terraced and semi-detached houses. It usually creates a large open-plan kitchen, dining and living area across the back of the house.

  • Steel frame or goalpost for the corner opening
  • Glazing, insulation, plastering and electrics
  • Optional kitchen supply and installation

What is the guide price for a wraparound extension in Islington?

Indicative costs for wraparound extensions. London and the South East usually sit towards the top of each range.

Wraparound extensionsGuide price incl. VAT
Standard specification£3,400 to £3,800 per m²
Good specification£3,800 to £4,250 per m²
High specification£4,250 to £4,700 per m²

Do you need permission for a wraparound extension in Islington?

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

In England a wraparound extension is treated as one extension, and because it covers both the side and the rear it does not normally fit within permitted development. Most need householder planning permission, which usually takes around eight weeks once validated.

What should I think about before starting?

  • Both neighbours may need party wall notices.
  • An open-plan space this size needs a heating plan, often underfloor heating.

What are the steps?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

Wraparound extensions: common questions

Does a wraparound need planning permission?

Usually yes. In England it combines a side and rear extension, which takes it outside permitted development in most cases.

How long does a wraparound take?

Around 12 to 18 weeks on site after approvals.

Can you visit a house in Islington to quote?

Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.

Also covering

Learn more about wraparound extensions, or see every project we cover in Islington.