Covering Leicester
Our coverage around Leicester (LE1, LE19) also includes Oadby, Wigston and Loughborough.
Homes in the East Midlands
Housing in the East Midlands includes Victorian terraces, inter-war semis and newer estates, with stone-built villages in some areas where conservation controls apply.
What does a wraparound extension involve?
Because it removes two external walls, a wraparound needs careful structural design and a good plan for the corner where the steels meet. We design, apply for any permissions, build and finish the shell, and can fit the kitchen as part of the same contract.
- Party wall process with both neighbours if needed
- Pitched, flat or glazed roof with rooflights
- Optional kitchen supply and installation
How much does a wraparound extension cost in Leicester?
Typical ranges for wraparound extensions. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.
| Wraparound extensions | Guide price incl. VAT |
|---|---|
| Standard specification | £3,400 to £3,800 per m² |
| Good specification | £3,800 to £4,250 per m² |
| High specification | £4,250 to £4,700 per m² |
How is a wraparound extension approved in Leicester?
English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.
In England a wraparound extension is treated as one extension, and because it covers both the side and the rear it does not normally fit within permitted development.
What should I think about before starting?
- The corner steel connection is the critical detail and is designed by a structural engineer.
- Both neighbours may need party wall notices.
What happens after I enquire?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
What people ask before starting
Does a wraparound need planning permission?
Usually yes. In England it combines a side and rear extension, which takes it outside permitted development in most cases.
How long does a wraparound take?
Around 12 to 18 weeks on site after approvals.
Can you visit a house in Leicester to quote?
Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.
Wraparound extensions near Leicester
- Wraparound extensions in Oadby
- Wraparound extensions in Wigston
- Wraparound extensions in Loughborough
- Wraparound extensions in Coalville
Learn more about wraparound extensions, or see every project we cover in Leicester.

