Wraparound extensions · Margate

Wraparound extensions in Margate

Planning wraparound extensions in Margate? We design and build them for houses across Kent, and we fix the price for the agreed specification in writing before any building work starts.

Covering Margate

Alongside Margate, we also cover Broadstairs, Ramsgate (3 miles to the south-east) and Deal.

Homes in the South East

Many South East homes are inter-war or post-war semis and detached houses with room for rear and side extensions, while historic town centres and villages bring conservation area and listed building controls.

What goes into a wraparound extension?

Because it removes two external walls, a wraparound needs careful structural design and a good plan for the corner where the steels meet. We design, apply for any permissions, build and finish the shell, and can fit the kitchen as part of the same contract.

  • Party wall process with both neighbours if needed
  • Steel frame or goalpost for the corner opening
  • Optional kitchen supply and installation

How much should I budget for a wraparound extension?

Guide prices for wraparound extensions, including VAT where it applies. Your fixed price is confirmed in writing after the survey.

Wraparound extensionsGuide price incl. VAT
Standard specification£3,400 to £3,800 per m²
Good specification£3,800 to £4,250 per m²
High specification£4,250 to £4,700 per m²

Do you need permission for a wraparound extension in Margate?

English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.

In England a wraparound extension is treated as one extension, and because it covers both the side and the rear it does not normally fit within permitted development. Most need householder planning permission, which usually takes around eight weeks once validated.

What should Margate homeowners check first?

  • Both neighbours may need party wall notices.
  • An open-plan space this size needs a heating plan, often underfloor heating.

What are the steps?

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Your questions answered

How long does a wraparound take?

Around 12 to 18 weeks on site after approvals.

Can we keep part of the kitchen working?

Often, by sequencing the work so the old back wall comes out last. We agree a plan with you before starting.

Who deals with the council for a project in Margate?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Other towns nearby

Learn more about wraparound extensions, or see every project we cover in Margate.