Wraparound extensions · New Milton

Wraparound extensions in New Milton

Homeowners in New Milton can get wraparound extensions from one company: the design, the paperwork and the building work sit with us rather than with three separate firms.

Covering New Milton

New Milton is about 15 miles south-west of Southampton. We also cover Christchurch (5 miles to the west), Bournemouth and Totton.

Homes in the South East

Housing across the South East mixes inter-war semis, post-war estates and older cottages in villages and market towns, so rear and side extensions, hip-to-gable lofts and garage conversions all come up regularly.

What is a wraparound extension?

Because it removes two external walls, a wraparound needs careful structural design and a good plan for the corner where the steels meet. We design, apply for any permissions, build and finish the shell, and can fit the kitchen as part of the same contract.

  • Steel frame or goalpost for the corner opening
  • Pitched, flat or glazed roof with rooflights
  • Optional kitchen supply and installation

How much should I budget for a wraparound extension?

Indicative costs for wraparound extensions. London and the South East usually sit towards the top of each range.

Wraparound extensionsGuide price incl. VAT
Standard specification£3,400 to £3,800 per m²
Good specification£3,800 to £4,250 per m²
High specification£4,250 to £4,700 per m²

Do you need permission for a wraparound extension in New Milton?

In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.

In England a wraparound extension is treated as one extension, and because it covers both the side and the rear it does not normally fit within permitted development.

What should New Milton homeowners check first?

  • The corner steel connection is the critical detail and is designed by a structural engineer.
  • An open-plan space this size needs a heating plan, often underfloor heating.

What are the steps?

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Questions about a wraparound extension in New Milton

Does a wraparound need planning permission?

Usually yes. In England it combines a side and rear extension, which takes it outside permitted development in most cases.

How long does a wraparound take?

Around 12 to 18 weeks on site after approvals.

Who deals with the council for a project in New Milton?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Wraparound extensions near New Milton

Learn more about wraparound extensions, or see every project we cover in New Milton.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote