Wraparound extensions · Northumberland

Wraparound extensions in Northumberland

Looking for wraparound extensions in Northumberland? We take projects from the first visit to the final sign-off, and confirm the price in writing first.

Covering Northumberland

Our coverage across Northumberland includes Blyth, Cramlington, Ashington and Bedlington.

Because Northumberland covers a wide area, we confirm availability after the first call and include any travel costs in the written quote rather than adding them later.

Homes in the North East

Housing across the North East ranges from colliery terraces and Tyneside flats to suburban semis and modern estates, each with different options for extending.

What is a wraparound extension?

A wraparound extension combines a side return and a rear extension into one L-shaped build, giving the biggest possible ground-floor space on terraced and semi-detached houses. It usually creates a large open-plan kitchen, dining and living area across the back of the house.

  • Design, planning drawings and structural calculations
  • Party wall process with both neighbours if needed
  • Steel frame or goalpost for the corner opening

How much should I budget for a wraparound extension?

Indicative costs for wraparound extensions. London and the South East usually sit towards the top of each range.

Wraparound extensionsGuide price incl. VAT
Standard specification£3,400 to £3,800 per m²
Good specification£3,800 to £4,250 per m²
High specification£4,250 to £4,700 per m²

How is a wraparound extension approved in Northumberland?

In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.

In England a wraparound extension is treated as one extension, and because it covers both the side and the rear it does not normally fit within permitted development.

What should Northumberland homeowners check first?

  • Both neighbours may need party wall notices.
  • An open-plan space this size needs a heating plan, often underfloor heating.

How does the project run?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

Wraparound extensions: common questions

How long does a wraparound take?

Around 12 to 18 weeks on site after approvals.

Can we keep part of the kitchen working?

Often, by sequencing the work so the old back wall comes out last. We agree a plan with you before starting.

Do you work in Northumberland?

Yes. Northumberland is within our coverage for wraparound extensions, along with nearby Blyth and Cramlington.

Wraparound extensions in nearby towns

Learn more about wraparound extensions, or see every project we cover in Northumberland.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote