What is included in a wraparound extension in Staveley?
Because it removes two external walls, a wraparound needs careful structural design and a good plan for the corner where the steels meet. We design, apply for any permissions, build and finish the shell, and can fit the kitchen as part of the same contract.
- Design, planning drawings and structural calculations
- Steel frame or goalpost for the corner opening
- Pitched, flat or glazed roof with rooflights
How much should I budget for a wraparound extension?
What wraparound extensions typically cost. These are guide ranges; the written quote for your house replaces them.
| Wraparound extensions | Guide price incl. VAT |
|---|---|
| Standard specification | £3,400 to £3,800 per m² |
| Good specification | £3,800 to £4,250 per m² |
| High specification | £4,250 to £4,700 per m² |
Do you need permission for a wraparound extension in Staveley?
In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.
In England a wraparound extension is treated as one extension, and because it covers both the side and the rear it does not normally fit within permitted development. Most need householder planning permission, which usually takes around eight weeks once validated.
What should I think about before starting?
- The corner steel connection is the critical detail and is designed by a structural engineer.
- Both neighbours may need party wall notices.
How does the project run?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Your questions answered
Does a wraparound need planning permission?
Usually yes. In England it combines a side and rear extension, which takes it outside permitted development in most cases.
How long does a wraparound take?
Around 12 to 18 weeks on site after approvals.
How do I get a price for wraparound extensions in Staveley?
Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.
Other towns nearby
- Wraparound extensions in Chesterfield
- Wraparound extensions in Dronfield
- Wraparound extensions in Sheffield
- Wraparound extensions in Worksop
Learn more about wraparound extensions, or see every project we cover in Staveley.